Energy & infrastructure in Rajasthan MCQ with Answers

20 questionswith explanationsfor RAS, CET and other Rajasthan exams

Read the notes first: Infrastructure: energy, transport and communication →

Questions

Tap an option to check your answer.

Q1

As per MNRE data (2026), which state has the largest installed solar power capacity in India?

Q2

The Rajasthan Integrated Clean Energy Policy 2024 sets a target of how much renewable energy capacity by 2029-30?

Q3

Consider the following statements about the Rajasthan Integrated Clean Energy Policy 2024: 1. Rajasthan Renewable Energy Corporation Ltd (RRECL) is the nodal agency under the policy. 2. Its solar component target is 90,000 MW by 2029-30. Which of the statements given above is/are correct?

Q4

Rajasthan's first wind power project, a 2 MW plant set up by BHEL in 1999, was located at:

Q5

The first unit of the Rajasthan Atomic Power Station at Rawatbhata was built with the collaboration of:

Q6

RAPP Unit-7 at Rawatbhata, which began commercial operation in April 2025, is an indigenous pressurised heavy water reactor of capacity:

Q7

The Mahi Banswara Rajasthan Atomic Power Project, whose foundation stone was laid in September 2025, is being developed by:

Q8

In which year was the Rajasthan State Electricity Board unbundled into five companies (one generation, one transmission and three distribution)?

Q9

Which of the following is NOT one of Rajasthan's state power distribution companies (discoms)?

Q10

Rajasthan Renewable Energy Corporation Ltd (RRECL) came into being in 2002 when the Rajasthan Energy Development Agency (REDA) was merged into:

Q11

The Anta gas-based power station in Baran district is operated by:

Q12

The coal-based Kawai thermal power plant in Baran district belongs to:

Q13

The first section of the Delhi–Mumbai Expressway, inaugurated by the Prime Minister at Dausa on 12 February 2023, was:

Q14

The eight-lane tunnel of the Delhi–Mumbai Expressway in Kota district passes through which protected area?

Q15

The Delhi–Mumbai Expressway does NOT pass through which of the following districts of Rajasthan?

Q16

The 306 km Rewari–Madar section of the Western Dedicated Freight Corridor, dedicated to the nation in January 2021, ends at Madar near which city?

Q17

Maharana Pratap Airport at Dabok serves which city?

Q18

The Kota–Bundi Greenfield Airport, whose foundation stone was laid in March 2026, is coming up at:

Q19

Consider the following statements about the HPCL Rajasthan Refinery at Pachpadra: 1. It is India's first greenfield integrated refinery-cum-petrochemical complex. 2. Its refining capacity is 15 million tonnes per annum. 3. It was dedicated to the nation by the Prime Minister in July 2026. Which of the statements given above are correct?

Q20

The gas-based combined cycle power station at Dholpur (330 MW) is operated by:

End of set