Energy & infrastructure in Rajasthan MCQ with Answers

20 questionswith explanationsfor RAS, Patwari, VDO and other Rajasthan exams

Questions

Q1

As per MNRE data (2026), which state has the largest installed solar power capacity in India?

  1. (1)Rajasthan
  2. (2)Gujarat
  3. (3)Maharashtra
  4. (4)Karnataka

Answer: (1) Rajasthan

Explanation

MNRE data for 2026 place Rajasthan first in installed solar capacity, followed by Gujarat and Maharashtra.

Q2

The Rajasthan Integrated Clean Energy Policy 2024 sets a target of how much renewable energy capacity by 2029-30?

  1. (1)100 GW
  2. (2)125 GW
  3. (3)75 GW
  4. (4)150 GW

Answer: (2) 125 GW

Explanation

The policy targets 125 GW (1,25,000 MW) of renewable energy capacity, including storage, by 2029-30.

Q3

Consider the following statements about the Rajasthan Integrated Clean Energy Policy 2024: 1. Rajasthan Renewable Energy Corporation Ltd (RRECL) is the nodal agency under the policy. 2. Its solar component target is 90,000 MW by 2029-30. Which of the statements given above is/are correct?

  1. (1)1 only
  2. (2)2 only
  3. (3)Both 1 and 2
  4. (4)Neither 1 nor 2

Answer: (3) Both 1 and 2

Explanation

RRECL is the nodal agency, and the 125 GW target includes 90 GW solar, 25 GW wind and hybrid, and 10 GW hydro, pumped storage and batteries.

Q4

Rajasthan's first wind power project, a 2 MW plant set up by BHEL in 1999, was located at:

  1. (1)Bhadla
  2. (2)Mathania
  3. (3)Nokh
  4. (4)Amarsagar

Answer: (4) Amarsagar

Explanation

The state's first wind power project, a 2 MW BHEL plant, was commissioned at Amarsagar in Jaisalmer in 1999.

Q5

The first unit of the Rajasthan Atomic Power Station at Rawatbhata was built with the collaboration of:

  1. (1)Canada
  2. (2)USSR
  3. (3)France
  4. (4)USA

Answer: (1) Canada

Explanation

RAPS-1 was a CANDU-type pressurised heavy water reactor built with Canadian collaboration in the early 1970s.

Q6

RAPP Unit-7 at Rawatbhata, which began commercial operation in April 2025, is an indigenous pressurised heavy water reactor of capacity:

  1. (1)220 MW
  2. (2)700 MW
  3. (3)500 MW
  4. (4)1,000 MW

Answer: (2) 700 MW

Explanation

RAPP-7 is a 700 MWe indigenous PHWR; it began commercial operation on 15 April 2025.

Q7

The Mahi Banswara Rajasthan Atomic Power Project, whose foundation stone was laid in September 2025, is being developed by:

  1. (1)Bharatiya Nabhikiya Vidyut Nigam Ltd (BHAVINI)
  2. (2)Indian Rare Earths Ltd (IREL)
  3. (3)Anushakti Vidhyut Nigam Ltd (ASHVINI)
  4. (4)NTPC Green Energy Ltd

Answer: (3) Anushakti Vidhyut Nigam Ltd (ASHVINI)

Explanation

ASHVINI, a joint venture of NPCIL and NTPC, is building the 4×700 MW project at Banswara; the PM laid its foundation stone on 25 September 2025.

Q8

In which year was the Rajasthan State Electricity Board unbundled into five companies (one generation, one transmission and three distribution)?

  1. (1)1997
  2. (2)2000
  3. (3)2003
  4. (4)2005

Answer: (2) 2000

Explanation

Under the Rajasthan Power Sector Reforms Act, 1999, RSEB was unbundled into RVUNL, RVPN and three discoms with effect from 19 July 2000.

Q9

Which of the following is NOT one of Rajasthan's state power distribution companies (discoms)?

  1. (1)Jaipur Vidyut Vitran Nigam Ltd
  2. (2)Ajmer Vidyut Vitran Nigam Ltd
  3. (3)Kota Vidyut Vitran Nigam Ltd
  4. (4)Jodhpur Vidyut Vitran Nigam Ltd

Answer: (3) Kota Vidyut Vitran Nigam Ltd

Explanation

Rajasthan's three state discoms are Jaipur, Ajmer and Jodhpur Vidyut Vitran Nigams; there is no Kota discom.

Q10

Rajasthan Renewable Energy Corporation Ltd (RRECL) came into being in 2002 when the Rajasthan Energy Development Agency (REDA) was merged into:

  1. (1)Rajasthan State Power Corporation Ltd
  2. (2)Rajasthan Rajya Vidyut Prasaran Nigam Ltd
  3. (3)Rajasthan State Mines and Minerals Ltd
  4. (4)Rajasthan Urja Vikas Nigam Ltd

Answer: (1) Rajasthan State Power Corporation Ltd

Explanation

REDA was wound up in 2002 and merged into Rajasthan State Power Corporation Ltd (RSPCL), which was renamed RRECL.

Q11

The Anta gas-based power station in Baran district is operated by:

  1. (1)NHPC Ltd
  2. (2)GAIL (India) Ltd
  3. (3)Tata Power
  4. (4)NTPC Ltd

Answer: (4) NTPC Ltd

Explanation

Anta Gas Power Station in Baran district is an NTPC station.

Q12

The coal-based Kawai thermal power plant in Baran district belongs to:

  1. (1)Adani Power
  2. (2)JSW Energy
  3. (3)Tata Power
  4. (4)Reliance Power

Answer: (1) Adani Power

Explanation

The 1,320 MW Kawai plant in Baran is run by Adani Power Rajasthan Ltd.

Q13

The first section of the Delhi–Mumbai Expressway, inaugurated by the Prime Minister at Dausa on 12 February 2023, was:

  1. (1)Lalsot–Kota
  2. (2)Delhi–Dausa–Lalsot
  3. (3)Kota–Ratlam
  4. (4)Vadodara–Ankleshwar

Answer: (2) Delhi–Dausa–Lalsot

Explanation

The 246 km Delhi–Dausa–Lalsot section was the first to open, cutting Delhi–Jaipur travel time to about 3.5 hours.

Q14

The eight-lane tunnel of the Delhi–Mumbai Expressway in Kota district passes through which protected area?

  1. (1)Ranthambore Tiger Reserve
  2. (2)Mukundra Hills Tiger Reserve
  3. (3)Ramgarh Vishdhari Tiger Reserve
  4. (4)Sariska Tiger Reserve

Answer: (2) Mukundra Hills Tiger Reserve

Explanation

The 4.9 km eight-lane tunnel passes under the Mukundra Hills Tiger Reserve so that wildlife movement is not disturbed.

Q15

The Delhi–Mumbai Expressway does NOT pass through which of the following districts of Rajasthan?

  1. (1)Alwar
  2. (2)Dausa
  3. (3)Pali
  4. (4)Tonk

Answer: (3) Pali

Explanation

In Rajasthan the expressway runs through eastern districts such as Alwar, Dausa, Sawai Madhopur, Tonk, Bundi and Kota; Pali in western Rajasthan is not on its route.

Q16

The 306 km Rewari–Madar section of the Western Dedicated Freight Corridor, dedicated to the nation in January 2021, ends at Madar near which city?

  1. (1)Jaipur
  2. (2)Bikaner
  3. (3)Sikar
  4. (4)Ajmer

Answer: (4) Ajmer

Explanation

Madar is near Ajmer; about 227 km of this section lies in Rajasthan, and the world's first long-haul double-stack container train was flagged off on it.

Q17

Maharana Pratap Airport at Dabok serves which city?

  1. (1)Jodhpur
  2. (2)Bikaner
  3. (3)Kishangarh
  4. (4)Udaipur

Answer: (4) Udaipur

Explanation

Maharana Pratap Airport is at Dabok, about 22 km from Udaipur.

Q18

The Kota–Bundi Greenfield Airport, whose foundation stone was laid in March 2026, is coming up at:

  1. (1)Shambhupura
  2. (2)Sangod
  3. (3)Keshoraipatan
  4. (4)Ramganj Mandi

Answer: (1) Shambhupura

Explanation

The foundation stone of the ₹1,507 crore Kota–Bundi Greenfield Airport was laid on 7 March 2026 at Shambhupura, between Kota and Bundi.

Q19

Consider the following statements about the HPCL Rajasthan Refinery at Pachpadra: 1. It is India's first greenfield integrated refinery-cum-petrochemical complex. 2. Its refining capacity is 15 million tonnes per annum. 3. It was dedicated to the nation by the Prime Minister in July 2026. Which of the statements given above are correct?

  1. (1)1 and 2 only
  2. (2)2 and 3 only
  3. (3)1 and 3 only
  4. (4)1, 2 and 3

Answer: (3) 1 and 3 only

Explanation

The 9 MMTPA complex at Pachpadra (now Balotra district) is India's first greenfield integrated refinery-cum-petrochemical complex; the PM dedicated it to the nation on 4 July 2026.

Q20

The gas-based combined cycle power station at Dholpur (330 MW) is operated by:

  1. (1)NHPC
  2. (2)Torrent Power
  3. (3)GAIL
  4. (4)RVUNL

Answer: (4) RVUNL

Explanation

The Dholpur Combined Cycle Power Station (3×110 MW), commissioned in 2007, is run by Rajasthan Rajya Vidyut Utpadan Nigam Ltd (RVUNL), the state generating company.