From Monday 23 November, tests and results are only in the TopKaro app. Get the app
Questions
Tap an option to check your answer.
Q1
As per MNRE data (2026), which state has the largest installed solar power capacity in India?
Answer: A Rajasthan
Explanation
Rajasthan. As per MNRE data (2026), Rajasthan has the largest installed solar capacity among Indian states, helped by the Thar desert's sunshine and big parks such as Bhadla.Not the others: Gujarat has the Charanka solar park, Karnataka the Pavagada solar park and Maharashtra is also a large solar state, but in the 2026 MNRE data each ranks below Rajasthan.Also remember: state rankings change as plants are added, so always quote the year of the MNRE figure.
Q2
The Rajasthan Integrated Clean Energy Policy 2024 sets a target of how much renewable energy capacity by 2029-30?
Answer: B 125 GW
Explanation
125 GW. The Rajasthan Integrated Clean Energy Policy 2024 targets 1,25,000 MW of renewable energy capacity by 2029-30, including 90 GW of solar.Not the others: 100 GW, 75 GW and 150 GW are not the target; the 2023 policy it replaced aimed at only 65 GW of solar by 2030, while the 2024 policy sets solar alone at 90 GW.Also remember: reports put wind and hybrid at about 25 GW within the 125 GW; the policy was approved just before the December 2024 Rising Rajasthan summit.
Q3
Consider the following statements about the Rajasthan Integrated Clean Energy Policy 2024:
1. Rajasthan Renewable Energy Corporation Ltd (RRECL) is the nodal agency under the policy.
2. Its solar component target is 90,000 MW by 2029-30.
Which of the statements given above is/are correct?
Answer: C Both 1 and 2
Explanation
Both 1 and 2. RRECL is the state's nodal agency for renewable energy, and the 125 GW target of the policy includes 90,000 MW of solar by 2029-30.Not the others: '1 only' wrongly drops the 90,000 MW solar target, '2 only' wrongly denies that RRECL is the nodal agency, and 'Neither 1 nor 2' fails because both statements hold.Also remember: RRECL was formed in 2002 when REDA was merged into the Rajasthan State Power Corporation, which took the new name.
Q4
Rajasthan's first wind power project, a 2 MW plant set up by BHEL in 1999, was located at:
Answer: D Amarsagar
Explanation
Amarsagar. The state's first wind power project, a 2 MW plant set up by BHEL, was commissioned in 1999 at Amarsagar in Jaisalmer district.Not the others: Bhadla is known for its large solar park, and Mathania and Nokh are also known for solar projects, not for the 1999 wind plant.Also remember: Jaisalmer district is the state's main wind-power belt.
Q5
The first unit of the Rajasthan Atomic Power Station at Rawatbhata was built with the collaboration of:
Answer: A Canada
Explanation
Canada. RAPS-1 at Rawatbhata (Chittorgarh district) was a CANDU-type pressurised heavy water reactor built with Canadian collaboration in the early 1970s.Not the others: the USSR (Russia) built Kudankulam in Tamil Nadu, the USA built the boiling water reactors at Tarapur in Maharashtra, and France's EPR reactors were planned for Jaitapur in Maharashtra.Also remember: RAPS units 3 to 6 are Indian-designed 220 MW reactors; RAPP-7 and RAPP-8 are 700 MW units.
Q6
RAPP Unit-7 at Rawatbhata, which began commercial operation in April 2025, is an indigenous pressurised heavy water reactor of capacity:
Answer: B 700 MW
Explanation
700 MW. RAPP-7 at Rawatbhata is an indigenous 700 MWe pressurised heavy water reactor; it reached criticality in September 2024 and began commercial operation in April 2025.Not the others: 220 MW is the size of the older RAPS units 3 to 6; 500 MW is that of the Prototype Fast Breeder Reactor at Kalpakkam; 1,000 MW is that of each Russian-designed Kudankulam unit.Also remember: RAPP-8 is the sister 700 MW unit of RAPP-7.
Q7
The Mahi Banswara Rajasthan Atomic Power Project, whose foundation stone was laid in September 2025, is being developed by:
Answer: C Anushakti Vidhyut Nigam Ltd (ASHVINI)
Explanation
ASHVINI. Anushakti Vidyut Nigam Ltd, a joint venture of NPCIL (51%) and NTPC (49%), is developing the 4 × 700 MW project at Banswara; the Prime Minister laid its foundation stone on 25 September 2025.Not the others: BHAVINI builds the fast breeder reactor at Kalpakkam; IREL is the public-sector rare-earths company; NTPC Green Energy is NTPC's renewable-energy arm.Also remember: the project, on the Mahi river near Napla, marks NTPC's entry into nuclear power.
Q8
In which year was the Rajasthan State Electricity Board unbundled into five companies (one generation, one transmission and three distribution)?
Answer: B 2000
Explanation
2000. Under the Rajasthan Power Sector Reforms Act, 1999, the Rajasthan State Electricity Board was unbundled from 19 July 2000 into RVUNL (generation), RVPN (transmission) and three discoms.Not the others: 1997 is before the 1999 Reforms Act, 2003 is the year of the central Electricity Act, and 2005 is after the unbundling had already happened.Also remember: the three discoms are Jaipur, Ajmer and Jodhpur Vidyut Vitran Nigam.
Q9
Which of the following is NOT one of Rajasthan's state power distribution companies (discoms)?
Answer: C Kota Vidyut Vitran Nigam Ltd
Explanation
Kota Vidyut Vitran Nigam Ltd. The state's three discoms are the Jaipur, Ajmer and Jodhpur Vidyut Vitran Nigams; there is no state discom for Kota.Not the others: the Jaipur, Ajmer and Jodhpur Vidyut Vitran Nigams were formed in July 2000 when the electricity board was unbundled, and each supplies a region of the state, so each is a genuine discom.Also remember: Rajasthan Urja Vikas Nigam Ltd (RUVNL) buys power on behalf of the discoms.
Q10
Rajasthan Renewable Energy Corporation Ltd (RRECL) came into being in 2002 when the Rajasthan Energy Development Agency (REDA) was merged into:
Answer: A Rajasthan State Power Corporation Ltd
Explanation
Rajasthan State Power Corporation Ltd. REDA was wound up in August 2002 and merged into RSPCL, which was then renamed Rajasthan Renewable Energy Corporation Ltd (RRECL).Not the others: Rajasthan Rajya Vidyut Prasaran Nigam is the transmission company, Rajasthan State Mines and Minerals the mining company, and Rajasthan Urja Vikas Nigam buys power for the discoms; none took over REDA.Also remember: RRECL is the state's nodal agency for renewable energy.
Q11
The Anta gas-based power station in Baran district is operated by:
Answer: D NTPC Ltd
Explanation
NTPC Ltd. The Anta gas-based station in Baran district, of about 419 MW, is run by NTPC, which also runs the gas stations at Auraiya and Dadri in Uttar Pradesh.Not the others: NHPC is a hydropower company; GAIL transports and processes natural gas rather than generating power at Anta; Tata Power runs the Mundra ultra mega power plant in Gujarat.Also remember: the state's own gas-based plant is the Dholpur combined cycle station.
Q12
The coal-based Kawai thermal power plant in Baran district belongs to:
Answer: A Adani Power
Explanation
Adani Power. The 1,320 MW (2 × 660 MW) Kawai coal-based plant in Baran district is run by Adani Power Rajasthan Ltd.Not the others: JSW Energy runs a lignite-based plant in Barmer; Tata Power's big plant is the Mundra ultra mega project in Gujarat; Reliance Power's Sasan ultra mega project is in Madhya Pradesh.Also remember: RVUNL's own coal-based plants include Chhabra (Baran), Kota, Suratgarh (Sri Ganganagar) and Kalisindh (Jhalawar).
Q13
The first section of the Delhi–Mumbai Expressway, inaugurated by the Prime Minister at Dausa on 12 February 2023, was:
Answer: B Delhi–Dausa–Lalsot
Explanation
Delhi–Dausa–Lalsot. The 246 km section, opened by the Prime Minister at Dausa on 12 February 2023, was the first part of the expressway to open, cutting Delhi–Jaipur travel time to about 3.5 hours.Not the others: Lalsot–Kota lies beyond Lalsot, so it came after; Kota–Ratlam runs from Kota towards Madhya Pradesh; Vadodara–Ankleshwar is in Gujarat, far from Dausa.Also remember: the expressway cuts the Delhi–Mumbai road distance from about 1,424 km to about 1,242 km.
Q14
The eight-lane tunnel of the Delhi–Mumbai Expressway in Kota district passes through which protected area?
Answer: B Mukundra Hills Tiger Reserve
Explanation
Mukundra Hills Tiger Reserve. The eight-lane tunnel near Kota, about 4.9 km long, passes beneath this reserve so that traffic does not disturb wildlife.Not the others: Ranthambore is in Sawai Madhopur, Ramgarh Vishdhari in Bundi and Sariska in Alwar district; none lies on the Kota stretch where the tunnel is built.Also remember: Mukundra Hills was notified as a tiger reserve in 2013 and takes in the old Darrah sanctuary near Kota.
Q15
The Delhi–Mumbai Expressway does NOT pass through which of the following districts of Rajasthan?
Answer: C Pali
Explanation
Pali. The expressway runs through eastern Rajasthan, serving districts such as Alwar, Dausa, Sawai Madhopur, Tonk, Bundi and Kota; Pali lies in the Marwar region of western Rajasthan, away from its route.Not the others: Alwar and Dausa are on the Delhi–Dausa–Lalsot stretch that opened first, and Tonk lies on the route further south.Also remember: near Kota the expressway has an eight-lane tunnel under the Mukundra Hills Tiger Reserve.
Q16
The 306 km Rewari–Madar section of the Western Dedicated Freight Corridor, dedicated to the nation in January 2021, ends at Madar near which city?
Answer: D Ajmer
Explanation
Ajmer. The 306 km Rewari–Madar section of the Western Dedicated Freight Corridor, dedicated on 7 January 2021, ends at Madar near Ajmer; about 79 km is in Haryana and about 227 km in Rajasthan.Not the others: Jaipur and Sikar are districts the section passes through on the way, not where it ends; Bikaner is not on this section at all.Also remember: on the same day the Prime Minister flagged off a double-stack container train from New Ateli to New Kishangarh.
Q17
Maharana Pratap Airport at Dabok serves which city?
Answer: D Udaipur
Explanation
Udaipur. Maharana Pratap Airport at Dabok, east of Udaipur, serves Udaipur and is named after the Mewar ruler Maharana Pratap.Not the others: Jodhpur's airport is a civil enclave in an Indian Air Force station, Bikaner's airport is at Nal, and Kishangarh airport serves the Ajmer–Kishangarh area; none is Maharana Pratap Airport.Also remember: Maharana Pratap fought the Battle of Haldighati in 1576 against the Mughal army led by Man Singh.
Q18
The Kota–Bundi Greenfield Airport, whose foundation stone was laid in March 2026, is coming up at:
Answer: A Shambhupura
Explanation
Shambhupura. The Rs 1,507 crore Kota–Bundi Greenfield Airport, whose foundation stone was laid on 7 March 2026, is coming up at Shambhupura in Kota district, about 15 km from Kota and 20 km from Bundi.Not the others: Sangod and Ramganj Mandi are Kota district towns and Keshoraipatan is in Bundi district; none is the airport site.Also remember: the Cabinet approved it in August 2025, to be funded by the Airports Authority of India, on about 440 hectares given by the state.
Q19
Consider the following statements about the HPCL Rajasthan Refinery at Pachpadra:
1. It is India's first greenfield integrated refinery-cum-petrochemical complex.
2. Its refining capacity is 15 million tonnes per annum.
3. It was dedicated to the nation by the Prime Minister in July 2026.
Which of the statements given above are correct?
Answer: C 1 and 3 only
Explanation
1 and 3 only. The Pachpadra complex (Balotra district) is described as India's first greenfield integrated refinery-cum-petrochemical complex; the Prime Minister dedicated it to the nation on 4 July 2026. Statement 2 is wrong: its refining capacity is 9 MMTPA, not 15.Not the others: every option containing statement 2 fails on that capacity figure.Also remember: HRRL is a joint venture of HPCL (74%) and the Government of Rajasthan (26%), with 2.4 MMTPA petrochemicals.
Q20
The gas-based combined cycle power station at Dholpur (330 MW) is operated by:
Answer: D RVUNL
Explanation
RVUNL. The 330 MW gas-based combined cycle plant at Dholpur belongs to Rajasthan Rajya Vidyut Utpadan Nigam Ltd, the state's generation company formed in 2000.Not the others: NHPC is a hydropower company; Torrent Power runs gas-based plants such as Sugen in Gujarat; GAIL is a gas transport and processing company and does not own this plant.Also remember: Anta in Baran is NTPC's gas plant, while RVUNL also runs thermal plants at Kota, Suratgarh and Chhabra.